Ground tidy up is under way now all the plumbing piping and electrical cable has been laid. Foam block and steel mesh has arrived for the pad and will start going down soon in preparation for the pad. The timetable on the water tanks has hopefully moved up slightly and we should have tanks soon. We're currently trying to source some water, but we can't get it supplied from within the water restricted zone, so we have to get it trucked in from some far off location.