The plumbing pipes and electrical cable is being put in today in preparation for the pad going down on the 14th. Looks like they've made quite a bit of progress already, with cable already run up to the front of the road, digging and trenches going on all the way up to the top of the hill, and plumbing pipes visible sticking up out of the ground on the summit where the pad will be going.