Fittings

Fittings are going in now. Most of the bathroom fit outs are done, toilets, basins, shower bits'n'pieces, bath tubs. Door handles are going on, light switches, power sockets are in. The security system is in. The kitchen appliances have arrived, but the stove is majorly damaged. Looks like someone dropped it or dropped something heavy on it, judging by the ripped metal plates down the back of it, and the severely bent top. Hopefully it won't take them too long to replace it. The light fittings are all in and working, although we've got a bayonet fitting in each room at the moment until we get an electrician into install fans in their place. Rob's also finding out if it's going to be possible to get the air conditioners installed now rather than waiting until handover.